CONTRACK INTERNATIONAL INC. / WATTS CONSTRUCTORs LLC
McLean VA, USA – (Feb-15 till Present)
(www.contrack.com)
Working
in Contrack International head office in McLean. Contrack is a leading
Contractor with EPC projects in USA, middle east and Asia. I am responsible
to develop, coordinate and review Project Schedule for various design build
construction Projects.
Main Responsibilities as
Planner/Scheduler are;
·
Develop / Perform Time impact
analysis (TIA) and develop the TIA package for approval.
·
Supports the development of
baseline schedule / detailed build strategies and coordinate with site
Schedulers. Submitting it to Government for approval and
adjusting/coordinating Gov review comments.
·
Identifies, sequences, and links
construction activities in accordance with
established build strategies and
scheduling criteria.
·
Progresses schedule on a monthly
basis, analyzes performance, conducts critical path analysis and
participates in efforts to address deviations to baseline, as required.
·
Supports the development and
maintenance of an integrated master
schedule by accurately entering
data from a variety of sources.
·
Prints progress reports for
programs that detail actual and projected cost and schedule performance,
resource requirements and earned value.
·
Assists in the development of
corrective action measures such as schedule revisions, manpower
adjustments, fund allocations, and work requirements.
·
Creating and maintaining regular
project status reports, baseline creation and maintenance, and metrics
analysis/reporting.
·
Developing the Work Breakdown
Structure (WBS), activity coding and resource definitions.
·
Loading resources, costs, and/or
budgets and track schedule.
·
Identifying project schedule
trends and perform analysis to mitigate delays and problems.
·
Experience with cost and
resource loaded Critical Path Method (CPM) scheduled on large scale
construction Projects utilizing Primavera P6 scheduling software.
PROGER SPA, ENGIEERING & MANAGEMENT (Italy) –
Saudi Arabia (Jan-14- Dec-14)
(www.proger.it)
Worked in Proger Spa, Engineering & Management, as Site Planning
Engineer from Jan 2014 till 15-Dec-2014 on the construction of King
Abdullah Project – 3. KAP3 is the largest construction projects on
the planet at this moment in time, with a budgeted cost of SR. 12 billion
(3.2 billion Dollar). It contributes monumental development that spans
the entire Kingdom of Saudi Arabia, encompassing in excess of 1.5M m2 and
is spread across over 610 sites.
Proger SPA, born as a professional practice in 1951 and registered
as a company in 1983, PROGER is today a leading, Italian and international
engineering and management organization, with head office in Pescara, main
operations offices in Milan and Rome, regional offices in Bucharest, Almaty
and Abu Dhabi and associate offices in Beirut, Dakar, London, Sofia,
Tripoli and Sydney.
Main Responsibilities as Planning Engineer are as
under:
·
Support and assist in the
planning & scheduling 610 projects which are part of the overall KAP3
program.
·
Preparing master schedule for
construction, Design and procurement.
·
Review and prepare Schedule
Baseline for the each Project packages in P6.
·
Monitor and update the schedule
in P6.
·
Assign budge and resources to
the time baseline schedule.
·
Assist in preparation of program
master schedule and performs critical path analysis.
·
Assist in integrating project
budget and schedule to support reporting.
·
Prepare schedule performance
measurements reports, forecasts and studies.
·
Prepares project plan framework
and detailed manpower utilization plan framework.
·
Assist in analyzing critical
paths and restraints to determine effect of changes on the schedule and
recommends workarounds to mitigate impacts.
·
Assist in preparing Risk and
Issue logs
·
Assist in preparing Cash flow
for overall Program.
·
Support the development of plans
and recommendations for mitigation of impacts of schedule problems.
·
Assist in the preparation of the
monthly progress report.
·
Assist in establishing and
monitoring project controls KPI's.
·
Support the implementation of
project policies and procedures.
·
Supports the Project Controls
team in accomplishing project status review and performance control.
·
Follow-up with construction team
for updates and issues.
·
Preparing letters to client and
contractor.
ALBAYRAK
CONSTRUCTION (TURKEY) - PAKISTAN
(www.albayrak.com.tr)
Worked in
Albayrak Construction, as Planning Engineer from Jan 2013 till Jan 2014.
Project
Executed is as under;
Construction
of Metro Bus elevated bridge, Lahore
Albayrak
Construction (Pakistan Branch), a part of the Albayrak Group of Turkey, was
involved in the construction of about 2.1 km of the elevated portion from
Qaddafi Stadium to Ichra on the Ferozepur Road. The construction work
comprised installation of almost 216 Nos. cast-in-situ 2.0 meter and 1.2 m
diameter and up to 53 meters deep piles. The elevated portion was supported
on a total of 61 Nos. large size piers. Piers were located 31 meters, which
was bridged by pre-stressed precast concrete girders, each weighing up to
50 tons. The deck slab which accommodates the bus track is 10 meters wide,
and comprised of asphaltic concrete laid over concrete slab. There are two
bus stations in the portion constructed by Albayrak Construction.
The work
was completed at a cost of Rs. 2.2 billion. ($220 millions)
Main Responsibilities as Planning Engineer were as under:
·
Preparing and Updating Master schedule
·
Preparing reports
·
Projects Coordination and progress reporting
·
Estimation and Bid preparation
DOKA (AUSTRIA) KINGDOM OF BAHRAIN/SAUDI ARABIA
(www.doka.com)
Worked in
DOKA Kingdom of Saudi Arabia / Bahrain, as Project Engineer From Jan, 2010
till November 2012.
·
Branch
Experience
Worked in Jeddah
and Dammam branch for technical support.
Main Responsibilities as Project Engineer are as under:
·
Planning and
Design
Studying all
Structural drawings of Project and calculating different loadings for
different part of Project to plan and Design the most construction
friendly, economical and safe design for complex structure using DOKA TIPOS
special software for designing the DOKA formwork systems.
I have deep
knowledge of designing all types of structures using different Doka
products for structure like, High rise buildings, Bridges , Power &
desalination plants, Elevated Towers, Storage Tanks, Industrial Projects
(Refinery, Steel factory etc)
·
Construction
Planning
Planning
construction activities for contractors for more safe, speedy and
economical construction.
·
Detail Design
Drawings for Concrete Pouring
Designing
formwork for client to erect at site the formwork using AutoCAD and showing
different pouring steps to be concreted.
·
BOQ
Calculating and
Preparing the accurate list of materials required for different structures
and at different pouring steps to make it most economical and fast.
·
Site
Inspection & Site Meetings
Presenting Doka
formwork and its benefits & discussing all technical issues with
client. Insuring the correct erection of formwork of complex structures
before concreting.
·
Major
Projects Executed
Holy Haram
Expansion, Saudi Arabia, LAMAR Tower, Saudi Arabia
CMA, Saudi
Arabia, Ras Al Zawr Power and Desalination Plant, Saudi Arabia
Holiday Inn,
Bahrain, National Theatre, Bahrain, Sakoon Tower, Bahrain, Banader Hotel,
Bahrain, Four Seasons Hotel, Bahrain
NATIONAL POWER CONSTRUCTION CORP LTD, SAUDI ARABIA
(www.npcc.com.pk)
I worked
in NPCC, as Construction Engineer on 380kV OHTL Project in Saudi
Arabia. The work was completed at a cost of SR. 272 million. ($73 million)
Main
Responsibilities as Site Construction Engineer were as under:
·
Foundations
Construction and Earth Works
1) Worked as
Site Construction Engineer for the construction of different types Tower
Foundations (apprx.300 Foundations)
i.e. Pad &
Chimney, Rock Anchor & Augur Foundations.
2) Construction
of Road (120km Sub-base level), Finger Roads and structure Pads using heavy
construction equipment specially in hilly areas i.e. Drilling and Cold
Blasting (4), Dozers (5), Excavators (35) & Shovel (6)
·
Planning
Engineer
Making
Construction Schedules for different activities to find the critical Path
activities using Primavera 6.
DONGFANG ELECTRIC CORPORATION (CHINA), PAKISTAN
(www.dongfang.com.cn)
Worked
with DEC at EPC construction of Jinnah Hydropower Project, Kalabagh as
Civil Engineer. The Jinnah Hydropower Project is situated on the right bank
of the Jinnah Barrage Which is about 5 km from Kalabagh. The work was
completed at a cost of $200 million. Constructing Power house and
Channels for Jinnah Hydropower. A Project of 4,000,000m3 Excavation, Filling and back filling 1,000,000
m3 ,220,000 m3Concreting and 15,000 tons reinforcement. Main
responsibilities were
·
Construction
Material Testing
Inspecting
Testing of all the construction materials (Bulk Cement, Steel
Reinforcement, Aggregates, Slag, and Concrete Admixture etc)
delivered to site according to ACI/ASTM/BS.
·
Concrete
work
Supervising
Concreting at site about 10,000m3 per month and ensuring concrete quality
at Concrete Batching Plant by DEC having a discharge rate of 3 m3 per mix.
·
Reinforcement
and formwork
Making
Bar bending Schedule and installing reinforced steel, formwork & its
supports according to concrete lift drawings.
·
Planning
Engineer
Making Construction Schedules for different activities to find the
critical Path activities using Primavera 6.
|